14 มกราคม 2021
When Raylex, a specialist in highly complex turnkey projects in the electricity, telecommunications, governmental, and mining sectors, needed to create an autonomous radio communications system as part of its hydroelectric project, it turned to Atlas Copco Power and Flow for a solution.
Raylex was commissioned to deliver a hydroelectric power station for the electric utility giant Enel Generación in the Maule River basin, in Los Cóndores, Chile. The development consisted of a run-of-river hydropower plant with an approximate installed power capacity of 150 MW.
The isolated location meant that no grid power was available, and the harsh weather conditions during the winter months made the site inaccessible for a considerable part of the year. That is why Raylex required the autonomous radio communication system to operate reliably with servicing only once per year, and practically no supervision.
Our projects require creative, efficient, and flexible solutions, and Atlas Copco has been a strategic partner in this. For years, we have worked together to design the best bespoke solutions that meet our customers’ needs. From the conception of an idea to the execution of the project, Atlas Copco’s team is involved in the entire process, crucially contributing to its success. They understood the challenges the hybrid generation presented and worked with us to configure a customized system that we use today as a benchmark for the industry.
We are delighted Raylex trusted us with this project. To deliver the right solution for our customers, we need to understand their needs. In this case, considering the combined challenge of the isolated location, extreme weather conditions and lack of electricity network helped us choose the right generator for Raylex’s project. Our QES range was the perfect fit: it is very versatile, thanks to the multiple customization options available, and it provides features including the high level of performance required.