Oil-free compressed air ready to assist during winter storms
Customer testimonial Chemical Oil & Gas
Chemical Plant in risk of shutting down was looking to stay up and running with minimum downtime.
Loading
Customer testimonial Chemical Oil & Gas
Chemical Plant in risk of shutting down was looking to stay up and running with minimum downtime.
When a geothermal power plant breaks down, urgent repairs are required to avoid high costs. As the rotor chamber contains highly flammable pentane gas, adding nitrogen speeds up the repair process, limiting downtime of the plant. Atlas Copco Special...
Customer testimonial Oil & Gas Midstream Pipeline commissioning
Flushing over 3,7 million cubic meters of air over a distance of 105 kilometers through a 36-inch diameter pipeline at 120barg in just a few days is a serious feat of engineering. Something, which can only be achieved thanks to meticulous preparation...