Enabling the transformation to a low-carbon society

Fully committed to being part of the solution for a better tomorrow, we have set science-based targets to reduce greenhouse gas emissions in line with the goals of the Paris Agreement.
Thumbnail image for a video introducing our science-based targets

Are you up for a challenge?

Join us on an interactive journey to learn more about our culture.
Atlas Copco colleagues in discussion.

Innovation stories

Do you want to learn about our innovations? How operators benefit from our ergonomic equipment or how we secure a minimal impact on the environment?
Corporate people observing parts of products in the field, cover image, ideas, backlight, touch screen

Our annual Industrial Ideas magazine

features stories about how we innovate for a sustainable future and push technology and society forward together with our customers.
Atlas Copco's Industrial Ideas magazine
Close

Stormy at Loch Ness

June 9, 2015

Industries:
Construction
Geography:
Europe

Around Scotland’s fabled Loch Ness, storms cut off power for a long period, but new generators at a primary substation aim to make such failures a thing of the past.

QAC 1250 power generator

In December 2013, inclement weather caused widespread power outages around Loch Ness in Scotland. The electricity supply was affected for 22 hours, and the threat of more disruption lasted for three days. Scottish and Southern Energy restored power, but it wanted to be ready for any additional failures in the 33-kilovolt overhead supply. Generator Power, SSE’s preferred generator supplier, put two trailer-mounted Atlas Copco QAC 1250 generators in place at a primary substation on the bank of Loch Ness. Both generators were connected to a step-up transformer unit on the front of their trailer. Supplying 2 megawatts together at 11 kilovolts directly onto the network, a single high-voltage connection could provide power to more than 200 homes. Due to the wide range of loads in the network, the generators were used in Power Management System (PMS) mode. This meant the second generator would start up only when demand on the first went above 60% capacity. When demand dropped below 40%, the first generator would shut down. PMS mode reduces wear on the lead unit and avoids having the second generator only run on light loads. The generators change priority when the lead set achieves 80% of its service hours. This balances out the running hours and allows both generators to be checked and serviced equally during a job. “With the PMS mode, these Atlas Copco generators are some of the most flexible units available on the market today,” says Michael Yeadon, Service Manager at Generator Power. Written by Linas Alsenas

Generators Scotland Europe QAC 1250 generators Construction